The Excelsior Project, 16: Engine Assembly

Head gaskets were water jet cut from .045" copper. A little deburring is needed .

A few parts have returned after nickel plating. It's a pretty simple bike, but there's a lot of pieces .

Assembly took place August 12, 2006. That was only a full six days behind schedule.

View of the bevel drive, cam towers, roller rockers, and sparkplug location .

Ever wondered what the left side of an OHC Excelsior motor looked like?
Hint > you are not alone!


Flashback Fabrications Inc.tel 604-888-8785email
PO Box 401Lynden WA98264

[ excelsior ][ other projects ] [ aermacchi nw ][ brodie bikes ][ paul brodie ][ site map ][ home ]